ERPNext Implementation for Pharmaceutical Manufacturers

Batch traceability, QC workflows, expiry management and GMP-aligned documentation — implemented by manufacturing ERP specialists. Fixed-price packages starting at ₹12 Lakh, delivered in 6-8 months.

₹12L Starting Price
6-8 mo Delivery Timeline
100% Batch Traceability

Running a Pharma Plant on Spreadsheets Is a Compliance Risk

❌ Recall Nightmares

A single batch recall means days of digging through registers and Excel files to trace which raw material lots went into which finished batches — and where they were shipped.

❌ Audit Panic

Regulatory and customer audits trigger weeks of preparing BMRs, QC records and deviation logs manually. Missing paperwork means observations and lost contracts.

❌ Expiry Write-Offs

No FEFO discipline means near-expiry stock sits at the back of the warehouse while fresh stock ships first — and lakhs get written off every quarter.

❌ QC Bottlenecks

Material sits in quarantine because QC approvals live on paper. Production waits, dispatches slip, and nobody can see WIP status in real time.

ERPNext, Configured the Way a Pharma Plant Actually Runs

💊

Batch Manufacturing

BOMs with overages and potency adjustments, batch-wise work orders, dispensing records, yield tracking, and batch manufacturing record (BMR) templates.

🔬

Quality Control & QA

Quarantine-to-release workflows, QC inspection templates with specifications, COA generation, retest dates, and deviation tracking with approvals.

🔍

End-to-End Traceability

Trace any batch forward to every customer and backward to every raw material lot. Mock recall drills that take minutes instead of days.

Expiry & FEFO Control

Mandatory expiry on every batch, FEFO-enforced picking, expired-stock dispatch blocking, and near-expiry alerts to cut write-offs.

📋

GMP Documentation

Audit trails on every transaction, role-based approvals, versioned documents and SOP-mapped workflows that keep you audit-ready year-round.

🤝

Loan Licensing & Third-Party

Subcontracting workflows for loan-license manufacturing, material reconciliation with job workers, and third-party manufacturing accounting.

Your 6-8 Month Roadmap to Go-Live

Pharma implementations need validation and parallel runs — not shortcuts. Here's how we deliver, milestone by milestone.

1

Process Study & Blueprint (Weeks 1-4)

On-site study of your manufacturing, QC, stores and dispatch processes. We map your SOPs to ERPNext and deliver a signed-off solution blueprint.

2

Core Configuration (Months 2-3)

Company, warehouses, item masters with batch settings, BOMs, QC templates, and accounts configured. Master data migrated from your existing systems.

3

Pharma Workflows & Customization (Months 3-5)

Quarantine-release cycles, BMR templates, dispensing, FEFO rules, approval hierarchies and pharma-specific print formats built and tested against your SOPs.

4

Validation & Training (Months 5-6)

End-to-end test runs with real batch scenarios, user acceptance testing signed off by QA, and role-wise training for production, stores, QC and accounts teams.

5

Parallel Run (Months 6-7)

ERPNext runs alongside your existing system for at least one full production cycle. Discrepancies are resolved before you commit.

6

Go-Live & Stabilization (Months 7-8)

Cutover with on-site support during the first production batches, followed by 90 days of post-go-live support and monthly optimization reviews.

Fixed-Price Pharma Packages

No hourly billing. No scope creep surprises. The price we quote after scoping is the price you pay.

Multi-Plant

Pharma Enterprise

Custom

Quoted after scoping

  • Everything in Pharma Standard
  • Multi-plant / multi-company setup
  • Loan licensing & third-party manufacturing
  • API integrations (LIMS, weighbridge, barcode)
  • Custom analytics & MIS dashboards
  • Dedicated project manager
  • Extended support contract options
Request a Quote
Add-On

Tally Migration

Bundle

With your implementation

  • Full historical data from Tally
  • Voucher-level transaction history
  • 100% trial balance reconciliation
  • GST & statutory data intact
  • Runs in parallel — no timeline impact
Learn About Migration

Manufacturing ERP Specialists, Not Generalists

🏭

Process Manufacturing DNA

Years of implementing ERPNext for chemicals, food and FMCG — industries that share pharma's batch, formula and compliance demands.

Explore Industries →

100% Success Rate

Every implementation we've taken on has gone live. Fixed scope, fixed price, and a parallel run before cutover keep your risk near zero.

Read Case Studies →
🌍

Global Delivery

Implementations delivered across India, the Middle East and beyond — with remote-first delivery and on-site milestones where it matters.

Talk to Us →

"Our last customer audit asked for the complete batch history of a two-year-old lot. What used to take our QA team three days of file-digging took eleven minutes in ERPNext. The auditors were impressed — and so was our MD when the expiry write-offs dropped by 70% in the first two quarters."

SP
Sunil Patil

Plant Head, Formulations Manufacturer (WHO-GMP Certified)

Pharma Implementation FAQs

Our pharma packages start from ₹12 Lakh for a single-plant setup covering manufacturing, inventory, quality, purchase, sales and accounts. Multi-plant and loan-licensing setups are quoted after a scoping call. Pricing is fixed before we start — no hourly billing surprises.
Pharma cannot be rushed like a trading setup. The timeline covers process mapping against your SOPs, GMP-aligned configuration, QC workflow setup, validation runs, role-wise training, and a full parallel production cycle before go-live. Cutting these corners is how ERP projects fail audits.
Yes. ERPNext tracks batch numbers from raw material receipt through dispensing, production, QC and dispatch. A recall query traces any batch forward to every customer who received it and backward to every input material batch — in minutes, not days.
We configure ERPNext to support GMP documentation practices: role-based approvals, document version control, audit trails on every transaction, batch manufacturing records (BMR), and QC inspection records. We map the configuration to your SOPs during implementation and support your audit-readiness documentation.
Yes. Every batch carries manufacturing and expiry dates. ERPNext enforces FEFO (First Expiry, First Out) picking, blocks expired stock from dispatch, and gives you near-expiry reports so you can liquidate stock before it becomes a write-off.
The starting package covers a single manufacturing site: process study, ERPNext configuration for manufacturing, inventory, quality, purchase, sales and accounts, batch and expiry setup, BMR templates, data migration, user training, a supervised parallel run, and 90 days of post-go-live support.

Ready to Make Your Pharma Plant Audit-Ready?

Book a free assessment call. We'll review your current processes, show you a pharma-configured ERPNext demo, and give you a fixed-price proposal.

Or WhatsApp us at +91 91371 95874